fbpx

Type: Build Operate Transfer for the road

Road-Building by BOT System

Point of Contact: Sagaing DICA
Region: Sagaing
Type: Build Operate Transfer for the road


The Gangaw-Kalay road 41/6 mile to 83/0 mile (41m2 furlong) project is included in Asian Highways and ASEAN highways and part of the Tamu-Mandalay-Meikhtila-Yangon-Bago (phayagyi)- Thahton-Myawady road (AH1).

Road-Building by BOT System

Point of Contact: Sagaing DICA
Region: Sagaing
Type: Build Operate Transfer for the road


The Monywa– Palae- Gangaw Road (65 miles) project is included in international Asian Highway and ASEAN highway and the part of Tamu-Mandalay-Meikhtila-Yangon-Bago(Phayagyi) Thahton-Myawady road(AH1).

Road-Building by BOT System

Point of Contact: Sagaing DICA
Region: Sagaing
Type: Build Operate Transfer for the road


This Ye Oo – Kalaywa Road (from milepost 0/0 to milepost 107 mile/1.5 furlong) BOT project is included in Greater Mekong Subregion Economic Corridors and part of Northern Corridor (Muse-Mandalay-Shwebo-Ye Oo-Kalaywa-Tamu).